WSO Task Report (WTR) Number: 22 Descriptive Name: Move QPC and Daystar into rack 4 Initiator: John Beck Date Opened: 2001/10/19 13:41 Date Problem Occurred: 2001/10/19 Priority: 4 Low Status: Closed -------------------------------------------------------------------------------- Description of Problem: The PDP 11 (and associated hardware) must be removed, shelves installed and QPC and Daystar installed in the rack. A shelf can be installed above the PC's for QPC's monitor and keyboard (eg. the istallation of solar2 in the computer room) -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Possible Consequences If Problem Persists: The array of cables in and around rack 4 hinders troubleshooting -------------------------------------------------------------------------------- Solution, Possible Solution, or Trouble Shooting Steps: -------------------------------------------------------------------------------- Other Comments: -------------------------------------------------------------------------------- Date Closed: 2007/10/10 14:29 Resolution: It is done! --------------------------------------------------------------------------