WTR Summary (All)
Open Mod Buttons
WTR Name Rank Date Actionee Date Status Update Assign Close
----------------------------------------------------------------------
0034 Verygzib good Sitelrxq!
JGB 2 2009/02/19 2011/06/20 Closed Update Assign Close
0033 TEST OF WTR
JTH 5 2008/09/19 2011/06/22 Closed Update Assign Close
0032 TEST OF WTR
JTH 5 2008/09/19 2011/06/22 Unassign Update Assign Close
0031 Magscan INTMIN troubles
JGB 3 2008/01/28 2011/06/22 Closed Update Assign Close
0030 exit slit limit switch
TPL 2 2008/01/09 2008/11/11 Closed Update Assign Close
0029 dome door limit switches
TPL 1 2007/11/20 2007/11/20 Closed Update Assign Close
0028 dome door motor
TPL 3 2007/11/20 2007/11/20 Closed Update Assign Close
0027 roaming dome
JRS 2 2002/05/06 JGB 2008/05/27 Closed Update Assign Close
0026 dome shutter motor failing
JRS 2 2002/04/30 JGB 2011/06/22 Assigned Update Assign Close
0025 WSO home page linking
PHS 3 2001/12/04 2011/06/22 Closed Update Assign Close
0024 Replace cable for Littrow focus drive
JRS 2 2001/11/16 2002/08/06 Closed Update Assign Close
0023 connect the house computer to the network in the observatory
JRS 3 2001/10/26 2007/10/10 Closed Update Assign Close
0022 Move QPC and Daystar into rack 4
JGB 4 2001/10/19 2007/10/10 Closed Update Assign Close
0021 update web site
JRS 3 2001/10/19 2011/06/22 Closed Update Assign Close
0020 check calibration
JRS 2 2001/10/19 PHS 2002/08/06 Closed Update Assign Close
0019 FITS format export files
PHS 3 2001/10/12 PHS 2011/06/22 Assigned Update Assign Close
0018 Inventory
JRS 2 2001/10/11 JRS 2011/06/21 Assigned Update Assign Close
0017 Need replacements for NSEW light indicators.
JRS 3 2001/10/11 JGB 2007/10/10 Closed Update Assign Close
0016 "set intmin 0" only works for 1st observation
JRS 3 2001/10/11 2002/04/10 Closed Update Assign Close
0015 "Intensity variance exceeds 5" warning in data reductions
JRS 3 2001/10/11 2011/06/22 Closed Update Assign Close
0014 Time-critical magscan duration (~2hours)
JRS 3 2001/10/11 2011/06/22 Closed Update Assign Close
0013 Check grating illumination
JRS 3 2001/10/11 JRS 2011/06/22 Closed Update Assign Close
0012 Errors in time-critical mean field measurements
JRS 2 2001/10/11 Unassign Update Assign Close
0011 Noise in the zeeman signal
JRS 2 2001/10/11 PHS 2002/08/06 Closed Update Assign Close
0010 Rewrite centering program
JRS 4 2001/10/11 JRS 2011/06/22 Closed Update Assign Close
Open Mod Buttons
WTR Name Rank Date Actionee Date Status Update Assign Close
----------------------------------------------------------------------
0009 HWMON definitions are cryptic and not very helpful in debugg
JRS 3 2001/10/11 2011/06/22 Closed Update Assign Close
0008 QPC and daystar clones
JRS 2 2001/10/11 JGB 2011/06/22 Closed Update Assign Close
0007 Install UPS
JRS 3 2001/10/11 JTH 2001/12/13 Closed Update Assign Close
0006 Bind circuit diagrams in protective covering.
JRS 3 2001/10/11 JRS 2009/11/16 Closed Update Assign Close
0005 Replace current network with wireless
JRS 3 2001/10/11 2007/10/10 Closed Update Assign Close
0004 WSO Pit Safety Training
JRS 3 2001/10/11 PHS 2002/03/13 Closed Update Assign Close
0003 Clean the rain sensor
JRS 3 2001/10/11 JRS 2008/12/14 Closed Update Assign Close
0002 Replace HV PMT Power Supply
JRS 3 2001/10/11 JRS 2007/10/10 Closed Update Assign Close
0001 resilver the mirrors
JRS 3 2001/10/11 JGB 2007/10/10 Closed Update Assign Close